• Concrete Project

Structural Concrete Repairs

Back to all projects

Project details

Company

LMS Reinforcing Steel Group

Service

Concrete Beam Repairs

Industry

Parkade

Materials

Concrete

 

 

The original install by others of the suspended structural beam reinforcing was done incorrectly. When consulted for the repair, Gator recommended that one beam be repaired at a time to maintain the structural integrity of the slab. Gator chipped away the existing concrete using small electric jackhammers to greatly improve control in an effort to minimize impact to surrounding concrete and reduce the chances of micro fracturing the surrounding concrete. We supplied and installed formwork using engineering drawings and then placed concrete with a finish to match the existing finish.